The completed Baiyappanahalli-Whitefield stretch will also include stops at Mahadevapura, Garudacharpalya, Hoodi Junction, Seetharama Palya, Kundalahalli, Nallurhalli, Sri Sathya Sai Hospital, Pattandur Agrahara, Kadugodi, Channasandra and Whitefield. All the pending work will be carried out simultaneously," reports The Hindu. By mid-October, the Metro coach will be shifted to the new track. Its just a matter of days away - the much-awaited Bangalore Metro will be open to. Prerequisite work for it has reached an advanced stage that includes traction, signalling, and other work. The Stockholm metro map is downloadable in PDF, printable and free. This extension will benefit thousands of commuters who spend over two hours in traffic every day to reach Whitefield or drive into the city from Whitefield.Īnjum Parwez, managing director, BMRCL, said, "Our officials are on the job to conduct the trial run. The 15.25 km elevated line from Baiyappanahalli to Whitefield has two reaches: R1A, which runs from Baiyappanahalli to Seetharama Palya for 8.67 km, and R1B, which runs from Seetharama Palya to Whitefield for 7.14 km.Ĭommercial operations must begin by December 2022, according to the BMRCL. By the end of October, the Bangalore Metro Rail Corporation Limited (BMRCL) plans to undertake a test run on Namma Metro's Purple Line section between Baiyappanahalli and Whitefield.
0 Comments
Leave a Reply. |